Train Sim World Wiki
Advertisement

Description[]

Having travelled up to Rockwood, you're quickly put to work at the nearby mine. Finish loading a train with coal and prepare it for its journey east to Cumberland Terminal.

Task Log and Objectives[]

  • You've been assigned to a Unit coal train today, which is currently sitting at Rockwood Loading Facility. First complete coal loading then bring the train back to Cumberland Terminal.
  • CLIMB ABOARD. Sit in the Engineer's seat of the lead locomotive
  • GO VIA LOCATION. Loading Facility
  • LOAD COAL.
  • TRACK SWITCH.Set the switch to the correct track
  • COUPLE TO FORMATION. 27 vehicles
  • PREPARE THE LOCOMOTIVE. Set the Reverser to NEUTRAL and the Autobrake to FULL SERVICE
  • INTEGRATED FUNCTION DISPLAY. Select the Air Brake screen [1] and then cress Cut-Out [F3], Trail [F4] and Save [F6]
  • INTEGRATED DISPLAY. For IFD functions, press the indicated buttons below the screen
  • SWITCH OFF SYSTEM. Switch off the Engine Run, Generator Field and Control Switch
  • CLIMB ABOARD. Sit in the Engineer's seat of the lead locomotive
  • PREPARE THE TRAIN. Set the Reverser to FORWARD and the Autobrake to FULL SERVICE
  • INDEPENDENT BAIL OFF. Hold the Independent Brake in BAIL OFF until the Brake Cylinders are empty of air
  • RELEASE THE BRAKES. The Brakes will take 5 minutes to release. Once complete, the Rockwood marker will appear and you may proceed.
  • STOP AT LOCATION. Rockwood Junction
  • T205. Await passage of an eastbound, then subject to signal indications, proceed from Rockwood Junction to Salisbury Junction on Main 2. Over.
  • Weather forecast doesn't look good, but you've got enough experience to handle the situation. Have a good trip.
CSX Heavy Haul
Locomotives AC4400CW - GP38-2 - SD40-2
Rolling Stock BethgonII® Coal Gondola - Husky Stack® 53-foot Container Car - 89-foot Bi-Level Auto Rack - 5201-Cubic Foot Covered Car - 30,500 Gallon Tank Car - 50 foot Plate C Boxcar
Locations Cumberland - Sand Patch - Shaw Mine - Rockwood Mine
Operators CSX Transportation
Tutorials Intro Sequence Tutorial - Yard Switching - Locomotive Turntable - Locomotive Refuelling - AC4400CW Introduction - Coal Loading - Train Brakes: Theory - SD40-2 Introduction - GP38-2 Introduction
Scenarios Sand Patch Summit - A Helping Hand - Clear Cut - Fully Fuelled - Cumberland Charge - Ice and Snow - Powering America Part 1 - Powering America Part 2 - Cumberland Switchback
Journeys GP38-2 Engineer - SD40-2 Engineer - AC4400 Engineer
Guides Driving the SD40-2, GP38-2 and GP40-2 - Driving the AC4400CW - The Alerter - Switching/Shunting - Loading Coal - CSX Collectibles
Miscellaneous Signalling - Service Mode Timetable
DLC CSX GP40-2 - CSX C40-8W
Advertisement